Methodist History Rebuilt (Literally) In Lebanon TN–Part 4

The structure is up!

 

The Main structure of the Asbury-Babb House reconstruction is complete

 

 

Stone steps on one side of the home

Stone steps are on the side opposite the road, while the accessibility walkway is on the road side of the house.

 

I had a chance to visit today and the foundation is complete, the log walls are all in place, the roof is done and the shakes are complete. This was our goal for what was to be completed by this time, with the understanding that there would still be a need for work on the chimneys, flashing, (both of which needed to be done before the gables could be completed,) chinking, interior and steps.

We also hoped we would be able to install a concrete walkway for accessibility, but that was expected to take more time.

David and his team did as they usually do, they took advantage of opportunities and re-prioritized. The main goals accomplished, they worked in a bit more. The grading is done already, with some drainage to keep water seepage away from the house (part of what caused the decay of the lower logs on the original construction.) Stones steps are on one side of the house while a cement walkway goes up to the other. One chimney is in place already, which I guess will speed up the completion of the gables, though I didn’t remember to ask David. The roof looks great as well.

 

Chimney and accessibility walkway

Chimney and accessibility walkway. There is a hidden drain between the walk and the house and the ground slopes to another drain to the right (unseen in the photo.)

 

There will be grass planted soon, we hope. I understand that the church behind which the home is located is supposed to decide on the type soon. It is hard to be certain how much work can be done during the winter. I did not have time to confer with David about all of that. I do know that chinking cannot be done in cold weather, so I suppose that will need to wait until next spring.

 

Grading falls away from house

The ground falls away from the house on the side towards the shurch. As soon as a decision is made regarding the exact type of ground cover needed, it will be in place, assuming the season is still right for it.

 

I apologize for the lack of a film link at this time. I thought I was filming a complete walk around explaining what I saw, but must have done something to the camera as it came out as a 2 second film. I will try to get up there soon for some video, but except for the drainage explanation and such, most of what I explained is what is written here and you can get the same views from these pics.

Thanks again to the team that is doing this. Also to all those community volunteers (and those who traveled pretty far to help) that we have yet to officially thank. I have met some of you and know where your heart is on this.

Jim

About these ads

The URI to TrackBack this entry is: http://historytnumc.wordpress.com/2010/10/16/methodist-history-rebuilt-literally-in-lebanon-tn%e2%80%93part-4/trackback/

RSS feed for comments on this post.

One CommentLeave a comment

  1. If you use the original chimney, make sure there are no missing bricks. Loose or missing bricks and chimney deterioration can be symptomatic of a major problem.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: